
Farhan Qureshi
Designed the acoustic floor, from the bass traps to the AC duct silencers, and measured it until the room read under 0.3s RT60.
Sits in on every recording rather than watching from outside, which is why episodes cut here rarely need a re-record.
At ENO since2021
Episodes engineered340+
Works inPodcast, Sound design
The rest of the crew
Book thestudio
Tell us what you are shooting and when. We will come back with a slot, a crew and a written quote — usually the same day.












